Skip to main content

⚡ Free site inspections across Lagos — book while seasonal slots last

0810 574 3694aaoengineeringservices@gmail.com

Solar & Power

Power Generation & Changeover Systems in Lagos That Start When the Grid Stops

Correctly sized, properly installed, safely switched.

  • 5.05 out of 5 starsGoogle Reviews
  • 5.05 out of 5 starsFacebook Reviews
  • 200+Installations
Certified, accredited & partnered with the best
  • CAC — Accredited
  • COREN — Accredited
  • NEMSA — Accredited
  • NSE — Accredited
  • REAN — Accredited
  • Felicity Solar — Partner brand
  • Luminous — Partner brand
  • Growatt — Partner brand
  • Deye — Partner brand
  • Hikvision — Partner brand

Get your free site inspection

No spam. An AAO expert responds within 24 hours.

Generator Supply, Installation & Changeover For Premises That Cannot Go Dark

Power Generation by AAO Engineering Services

A generator is only as good as the installation around it. We are called out constantly to sets that are the wrong size for the load, wired through a changeover nobody trusts, sitting in an enclosure that traps its own heat and fumes.

So the fuel burns carrying almost nothing. The set struggles the moment a compressor starts. And the switchover depends on somebody being awake, nearby and willing to walk out in the rain.

AAO Engineering Services sizes every set against a measured load. Every installation gets proper earthing, cable sizing and ventilation. Every changeover, manual or automatic, is interlocked, labelled and tested under real load while you watch.

What's Included In Every Installation

  • Sizing against real load

    The set is matched to measured demand and starting surges, so it is not oversized, idling and burning fuel.

  • Clean changeover

    Manual or automatic transfer, correctly interlocked so grid and generator can never meet, and clearly labelled.

  • Safe installation

    Proper earthing, cable sizing, ventilation and exhaust routing — the parts that decide whether a set lasts.

  • Testing and servicing

    Commissioned under load in front of you, with a service interval agreed so it still starts in six months.

How We Install Backup Power

From first call to final switch-on—no surprises, no shortcuts.

01 · We look at where the set can sit safely, how the exhaust will run and how the cable route reaches your board.

Past Work

Work We Have Already Delivered

Completed installations across Lagos — the same crew, the same standards, whatever the job.

Reviews

What customers say about our work

Contact Us

Let’s Fix Your Power & Security, Starting with a Conversation

Have questions about solar sizing, inverter backup, CCTV coverage, or smart access? Tell us what you’re dealing with, and an AAO expert will guide you toward the right solution—with no pressure, no fake products, and no guesswork.

or send it on WhatsApp

Prefer WhatsApp? Message us anytime · We reply within 24 hours

FAQ

Power Generation: Your Questions Answered

Enough for your measured load plus the starting surge of your heaviest motor — usually less than people expect. We measure first, because an oversized set costs more to buy and burns fuel carrying very little.